Pipe jacking and directional drilling (HDD)

Trenchless installation beneath roads, railways and waterways.

SCOPE OF WORK

What the service covers

We carry out pipe jacking and HDD directional drilling. The route, material and method are selected for ground conditions, existing utilities and project documentation, limiting surface disturbance.

ASK FOR AN OFFER
Pipe jacking and directional drilling (HDD)
+48 508 837 194FREE QUOTE
Item · Scope of work1–6
1HDD directional drilling
2Crossings under roads and railway tracks
3PE carrier and casing pipes
4Crossings of watercourses and protected areas
5Bore route design and drilling supervision
6Location of existing utilities
FAQ

Frequently asked

1When does drilling pay off instead of trenching?

HDD can be considered for road, railway and waterway crossings. Its suitability, cost and duration depend on ground conditions, utilities, the route and required approvals.

2What pipes do you install with the HDD method?

Pipe material and diameter depend on the installation, design and drilling conditions. We confirm the scope when preparing the offer.